Before installing exterior walkway anti-slip nosings under a QA spec that requires dimensional sign-off before full install, what is the first documented step called for in keyed site practice?

Choices

  • (A) Seal the area without a mock-up drawing
  • (B) Field mock-up with measured edge geometry and engineer acceptance per spec
  • (C) Swap skid material based on visuals without engineer buy-in
  • (D) Defer sign-off indefinitely without acceptance tests

Correct answer: (B)

Field mock-up with measured edge geometry and engineer acceptance per spec

Explanation

Mock-ups settle edge geometry disputes before fleet installation.