Verify drawing revision, authority reference number, and consultant stamp on the first sheet. Match every attachment name with the portal checklist order so reviewers can reconcile quickly.

Use one bilingual summary page at the top with scope, permit reference, and who verified technical content. This reduces back-and-forth and makes escalation easier if a file is rejected.