Before casting a steel column base plate with a defined anchor-bolt pattern, what is the best practice to hold bolt positions until concrete sets?
Choices
- (A) One-time eyeball layout without a template
- (B) Use a fixed template or shop jig matching the pattern, check dimensions/angles, and lock against movement during pour
- (C) Pour first and drill bolts later as needed
- (D) Heat-adjust bolt locations during the pour without engineer approval
Correct answer: (B)
Use a fixed template or shop jig matching the pattern, check dimensions/angles, and lock against movement during pour
Explanation
Templates prevent pattern drift that breaks steel-to-base fit-up.