Why do some programmes keep reshores under lower slabs after upper forms are stripped?

Choices

  • (A) For decorative sightlines beneath decks
  • (B) Construction stacking and curing loads still pass through supporting slabs until the full frame matures
  • (C) Concrete never transfers shear between floors
  • (D) Upper shoring alone solves all tributaries blindly

Correct answer: (B)

Construction stacking and curing loads still pass through supporting slabs until the full frame matures

Explanation

Load paths follow pour sequence not a single stripping gate.